Start with household energy, not a panel count
A useful home solar design begins with at least 12 months of electricity use when available, plus planned loads such as an EV, heat pump, workshop, or electric water heating. The bill amount is a helpful qualifier, but kWh usage and seasonal patterns create a stronger design basis.
Reviewing monthly use also exposes questions that an annual total can hide. A summer peak may come from cooling, while a winter peak may come from electric heat. A recently purchased home may not have representative history. Note occupancy changes, efficiency work, and equipment that may be added or removed so the designer can label assumptions rather than presenting them as facts.
Roof and electrical conditions shape the array
Roof planes, shade, setbacks, structure, service equipment, and utility rules can limit placement or change project scope. Ground mounting can be an alternative when roof conditions or available area call for it. A qualified review should identify assumptions and any nonstandard work in writing.
Orientation and pitch matter, but they do not decide feasibility by themselves. A useful site review considers obstructions, seasonal shade, roof age and material, attachment locations, fire-access requirements, wiring routes, equipment locations, and safe service access. If a roof is likely to need work during the expected life of the array, ask how removal and reinstallation would be handled. For a ground mount, discuss usable land, trenching, soil or foundation conditions, vegetation, and access.
The electrical review should identify the existing service and panel configuration, proposed point of connection, shutdown equipment, and any upgrade included or excluded from scope. Utility interconnection requirements and local codes can affect the final design. A preliminary online assessment cannot replace this review.
Choose an architecture in context
Module wattage is only one characteristic. The proposal should explain how the modules, inverter architecture, racking, monitoring, and optional battery equipment operate together. Ask how shade or different roof planes are handled, what data the monitoring system exposes, and what happens to grid-tied solar during an outage. Conventional grid-tied solar generally does not provide backup by itself; backup requires a compatible design and defined loads.
Compare complete proposal scope
Ask for exact module and inverter models, quantities, production assumptions, monitoring, racking, permits, interconnection responsibilities, warranties, and exclusions. Review system examples, compare architectures, or learn about the installation process.
| Proposal topic | What should be clear in writing |
|---|---|
| Energy basis | Usage period, planned-load assumptions, and data gaps |
| Array | Module model, quantity, layout, and system rating |
| Production estimate | Weather source, shade and loss assumptions, and whether the estimate is modeled rather than guaranteed |
| Electrical scope | Inverters, controls, protection, panel work, wiring route, and exclusions |
| Project responsibilities | Design, engineering, permits, utility applications, inspections, and commissioning |
| Coverage | Separate manufacturer and installer workmanship terms, plus who handles service |
Do not compare proposals by panel count or headline price alone. One quote may include electrical or roof-related work that another lists as an allowance or exclusion. Ask each provider to resolve unclear line items and describe how discoveries after site review become change orders.
A practical next-step checklist
- Gather recent usage history and list planned electrical loads.
- Note roof age, known leaks, shade, and possible ground-mount space.
- Decide whether the main goal is energy production, outage preparation, future storage, or a combination.
- Compare exact equipment and included project scope, not only a sales label.
- Read the production assumptions, warranty documents, payment terms, and exclusions before signing.
Use the solar installation assessment to organize the property basics, then review the solar cost guide before comparing written proposals. Final equipment, production, price, schedule, and availability depend on the property, local process, and provider agreement.
Match the options to your home
Start with a free preliminary assessment. Final equipment, price, availability, and terms follow provider and site review.
Get my system match