Before work begins
A provider may conduct remote and onsite reviews, finalize design, obtain engineering, file permits, submit utility applications, and schedule equipment. Resolve roof or electrical scope changes in writing.
Installation and inspection
Crews need safe access and may temporarily interrupt power. Mounting, wiring, protection, labels, controls, and monitoring should follow the approved design. Local inspection and utility steps vary.
Activation and handoff
Do not assume the system can export immediately after physical installation. Commissioning or permission to operate may be required. Collect final drawings, serial numbers, warranty records, operating instructions, and emergency shutdown guidance. See the installation overview.